๐ Galois:
It is recommended not to exceed 500 capture points per project. Staying within this limit helps ensure optimal processing performance.
๐ G1:
Each G1 project supports a maximum of 100 capture points.
Once the limit is reached, you will not be able to continue capturing within the same project.
๐ Co-capture with Galois:
When using co-capture mode with Galois, up to 10 projects can be merged into a single project.
ย The merged project must not exceed 1,000 capture points in total.
